A - B - C - D - E - F - G - H - I - J - K - L - M - N - O - P - Q - R - S - T - U - V - W - X - Y - Z
A
ACD
Amended Construction Documents (OSHPD) - Any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents.
ACO
Area Compliance Officer (OSHPD)
AOR
Architect of Record
B
BIM
Building Information Modeling - a process supported by various tools and technologies involving the generation and management of digital representations of physical and functional characteristics of places.
Business Hours
Business hours dictate the time range an IR can be scheduled, e.g. 8:00AM - 5:00PM.
C
CC List
A list of people that will be notified when something occurs. For example, if the status of an RFI changes, all users on the CC list for that RFI will be notified by email.
Change order
Work that is added to or deleted from the original scope of work of a contract, which alters the original contract amount and/or completion date.
Common IR
Inertia uses over 1500 predefined "Common" Inspection Request types to help categorize and differentiate each inspection. Each Common IR type uses a 4 digit code, where the 2 digit prefix indicates the specific trade. For example, the prefix 22 is for Plumbing, and IR type 2201 is used for "Plumbing - Support: Gravity".
Cutoff Time
The cutoff time is the time of day used to evaluate if the user transaction will be considered as current business day, or next business day.
CxA
Commissioning - Commissioning ensures that the new building operates initially as intended
D
DDNC
Deviation, Deficiency and Non-Compliant Issue log. This tool is used by the inspection team to log issues and non-compliant items.
DSE
District Structural Engineer (OSHPD)
F
Fail w/issue
When an IR is failed due to a found issue outside of the scope of the original inspection request
Failed IR
When an IR is failed by the Inspection Team
Failure Rate
An inspection analytics percentage result regarding Failed IRs
FLSO
Fire and Life and Safety Officer (OSHPD)
Folder Tree
The folder tree displays the floor plans for location tracking functions
G
Gantt
A graphical depiction of a project schedule. This is a type of bar chart that shows the start and finish dates of several elements of a project that include resources, milestones, tasks, and dependencies
GC
General Contractor
I
ICD
Intelligent Construction Drawings. This patent-pending technology links (2d & 3d BIM) construction documents to the cloud database to produce high-fidelity object-linked smart construction sheets, allowing users to assign records to items, rather than areas. Want to learn more about ICD? Read more here
IG
Interactive Graphic. Typically, this is inclusive of all maps and floor plans in your account
Inquiry
A less formal version of an RFI. Inquiries can be answered directly, or be escalated to a formal RFI
IOR
Inspector of Record
IR
Inspection Request
IR to GC action onsite delay
The advanced scheduling notice/delay rule required/enforced on the OPEN action when inspections take place ON the job site
IR to GC action offsite delay
The advanced scheduling notice/delay rule required/enforced on the OPEN action when inspections take place OFF the job site
IR to GC Cutoff
Time of day used for evaluating IR to GC action submitted by the user
IPD
Integrated Project Delivery - Integrated project delivery is a collaborative alliance of people, systems, business structures and practices into a process that harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction
J
Jurisdiction
The governmental agency or sub-agency that regulates the construction process
L
LEED
Leadership in Energy and Environmental Design - global organization responsible for providing green building certifications.
M
Monday Rule
A special delay/notification for handling Monday RSD vs all other days of the week.
N
"New to GC" action
The action that moves the IR from theSub-contractor tot he General contractor for a quality control review. The end result is (STAGE=Quality Control) and (STATUS=NEW)
Notifications
Notifications from Inertia are sent via email. Learn more about setting up your project notification settings here: Project Notification Settings
O
Onsite vs Offsite
The button to determine the general location of the inspection. Each has the option for different scheduling rules, as described below.
"Open" Action
The action moves, or OPENS the IR to the inspection users. The end result is (STAGE=INSPECTION) and (STATUS=OPEN)
"Open" Action Cutoff
The time of day used for evaluating OPEN action submitted by the user
"Open" Action Onsite Delay
The advanced scheduling notice/delay rule required/enforced on the OPEN action when inspections take place ON the job site
OSHPD
The Office of Statewide Planning and Development - the organization that oversees government mandated inspections in California
P
Passed IRs
When an IR is passed by the Inspection Team.
Project Notifications
Inertia can send a variety of project notifications directly to your email inbox. Notifications can be sent daily, hourly, in real time, or not at all. To learn more about configuring these notifications, check out this article: Project Notification Settings
Punch List
A document prepared near the end of a construction project listing work not conforming to contract specifications that the general contractor must complete prior to final payment.
R
Request for Information (RFI)
An RFI is a request for information that is used in construction to clarify any uncertainties or to fill in any gaps in information that may be found in any specifications, plans, contracts, or other documents.
Requested Schedule Date (RSD)
The date and time defined by the record author (usually the sub-contractor) for when they are requesting the inspector show up. This date/time usual indicates the work is complete and ready for inspection.
S
Scheduling delay/notification
The time period required between the time when the IR is submitted and the date/time that the inspector is requested to visit the site.
Subcontractor (Sub)
A general or specialty contractor who works under another general contractor .
Submittals
A document providing necessary information to a General Contractor, Design professional, or Owner. Learn more about Submittals in Inertia here: Quick Start Guide: Submittals
Success Rate
An inspection analytics percentage result regarding Passed IRs.
T
TIO
Testing, Inspections, & Observations (OSHPD)
W
WAN
Work Activity Notice - Tool is used by the contractor and sub-contractor to notify the inspection team of upcoming work actives so that the inspection team can schedule and coordinate inspections. Learn more here: Inertia Mobile: Create WAN
WAN Calendar
Work Activity Notice Calendar - The WAN Calendar is used to visually display all work activity item in Gantt view in daily/weekly/monthly calendar. The WAN Calendar will contain display all inspection related activities.
WBS
Work Breakdown Structure - a key project deliverable that organizes the team's work into manageable sections.
Comments
0 comments
Please sign in to leave a comment.